• Conveying

    Conveying

  • Drying

    Drying

  • Seed Processing

    Seed Processing

  • Electronic Sorting

    Electronic Sorting

  • Storage

    Storage

  • Turnkey

    Turnkey

  • Service

    Service

View our News magazine.
Novelties and orders.

A selected overview of supplied orders from around the world, from Turnkey plants and processing lines to drying and storage installations and equipment supplied cleaning and conveying a broad variety of crops and products.

Read more

 

Global perspective.
Local focus.

A number of Cimbria offices, dealers and agents are located throughout the world, always close at hand and ready to provide service to all our customers. Their dedication and capabilities are key factors in our success.

Read more

 

Meet Cimbria.
Trade show overview.

Every year Cimbria participates in trade shows all over the world.  Here, you will meet local representatives of Cimbria products with comprehensive technical knowledge of the products being exhibited.

Read more

NEWS

Inauguration of Cimbria record-breaking order

29 May 2017

The President of Egypt officially inaugurates Cimbria record-breaking silo plant order.

The President of Egypt officially inaugurates Cimbria record-breaking silo plant order.

On 14th of May 2017, 23 large silo plants supplied by Cimbria to Egypt have been commissioned and officially inaugurated by the President of Egypt, H.E Abdel Fattah El Sisi during a huge event in El-Marashda near Luxor.

This project is considered to be the largest order for silo plants ever made world-wide and comprising a total storage capacity of no less than 1,38 million tonne of wheat with a contract value for Cimbria of more than 100 million US dollars.

Around 400 VIP´s were gathered in an air-conditioned tent at the silo site where the President of Egypt H.E. Abdel Fatah al-Sisi together with his Prime Minister and three other ministers were present during a six hours event. The President headed the official opening of the silo and was in addition on video for three other silos as well as other new infrastructural constructions.

It was a great event, well planned by the Egyptian Authorities, and Cimbria were  praised highly for its role in the successful completion of this mega project. The President visited the control room and inspected the receiving area as well as outloading during operation with grain taken in and discharged into truck.

 

The Egyptian wheat harvest started in April and grain has been taken in at all the plants through the country. Geographically, the locations of the 23 plants stretch from the Mediterranean Sea and Suez all the way down to Aswan, in addition to a plant at East Owinate 600 km west of Aswan.

The order included project design and engineering, supply of conveying equipment, cleaners, laboratory equipment and electronic operation and control units as well as supervision, and training of operators. Each of the 23 plants has a silo capacity of 60,000 tonnes, including conveying and cleaning facilities with a capacity of 200 tonnes per hour. The entire scope was supplied within 9 months and contained about 1400 containers of equipment and materials.

Back

Do you need some advice?  

Please contact Cimbria for any questions you may have concerning our company, products or services.

You may contact the headquarter, select a local office below or fill in the contact form, and we will reply as soon as possible.

A/S Cimbria

Faartoftvej 22
P.O. Box 40, 7700, Thisted
DENMARK

Phone:  +45 96 17 90 00
E-mail: holding@cimbria.com

Fill out the form and we will
contact you

Company  
Name  
Country  
Email  
Phone number  
Subject 
Browse